Latest News

Latest News Main Page | Archive

Archive for the ‘Product’ Category

New entrance canopy designed for Wilmott Dixon

Monday, September 26th, 2016

Wilmott Dixon required a bespoke entrance canopy for a project they were constructing at Ixworth Free School in Ixworth, Suffolk.

proposed-res

 

We

New entrance canopy built for primary school Essex

Monday, September 26th, 2016

St. Mary’s Primary School, in Hatfield Broad Oak, Essex,

St. Mary’s Primary upgraded their entrance canopy with Setter Shelters

Monday, February 22nd, 2016

before 1 res

St. Mary’s Primary School in Hatfield Broad Oak desired to get rid of their existing canopy, which they believed to be an eyesore to the front of their school building.

They called Setter Shelters in to remove the shelter and design, manufacture, and install a replacement canopy, to refresh their main entrance.

We began by carefully removing the existing canopy

We began by carefully removing the existing canopy

We

New Entrance Canopy design at Ixworth Free School

Monday, February 22nd, 2016

Wilmott Dixon required the construction of

Brand new designs at Cotton End

Friday, March 6th, 2015

Working in partnership with Scape and Kier Construction, Setter Limited have been installing our cutting-edge entrance canopies across Bedfordshire.

Cotton End’s recently constructed new school buildings needed modern entrance canopies to match their stylish design.

CAD drawing of the Entrance Canopy

CAD drawing of the Entrance Canopy

Rendered CAD drawing of the Canopy, displaying a variety of coloured polycarbonate sheets

Rendered CAD drawing of the Canopy, displaying a variety of coloured polycarbonate sheets

We came up with an ingenious solution; a metal structure encased in a wood finish. This combines the structural integrity of steel with the style and elegance of wood.

The focal point of the entrance canopy, however, is, the coloured roof. Setter has just begun to offer these canopies in a huge range of colours, and Cotton End elected for a variety to help brighten up their playground.

All designs are CAD-produced, allowing easy integration into the site plans. All structural calculations are made prior to installation, to ensure the canopies meet the most stringent of requirements placed by the main contractor.

The finished article. Two Rainbow Canopies at Cotton End Primary School

The finished article. Two Rainbow Canopies at Cotton End Primary School

Cotton End Primary School were ecstatic with their canopies, the installation was seamless, and we are proud of another Setter Shelters job well done!

Another Canopy for a different section of the new build, in a different colour.

Another Canopy for a different section of the new build, in a different colour.